Cheryl Bowman – Manager Program Implementation


Cheryl Bowman is Manager of Program Implementation in the Energy Efficiency Department at CenterPoint Energy. She is responsible for the implementation of all residential and commercial energy efficiency and load management programs which include ensuring the programs meet regulatory requirements and statutory goals. Mrs. Bowman has over twenty years’ experience in program implementation and development in energy efficiency and demand side management.


Healthcare Energy Efficiency Program (HEEP)


The Healthcare Energy Efficiency Program (HEEP) program offers customized engineering solutions that are focused on improving the energy performance of healthcare facilities including clinics, hospitals, laboratories, assisted living centers, nursing homes and medical office buildings. 


The HEEP program was very successful in 2017, resulting in a reduction of 550 kW and 6.7 GWh for our participants.  The program supported 52 projects in the past 4 years and achieved a total savings of 2,336 kW and 19.3 GWh.  Incentives totaling $1.81 million were paid to program participants since 2014.


Program benefits include:

  • Energy assessment of the facility at no cost to program participants, as applicable
  • Benchmarking of the facility at no cost to program participants, as applicable
  • Cash incentives for eligible measures
  • Free technical services, as necessary
    • Demand and energy savings calculations,
    • Assistance with measurement and verification calculations
    • Case study development




Retro-Commissioning Program (RCx)

Improve energy efficiency on existing commercial buildings, including manufacturing facilities, hospitals, educational campuses, retail stores, with CenterPoint Energy’s Retro-Commissioning Program (RCx). A technical energy analysis is performed on your facility at NO cost to Owner, by a qualified RCx agent.  Existing facilities should be at least 50,000 square feet of air-conditioned space.  Facilities should have a higher than average energy consumption.  Projects must be completed by approved project deadlines.

Customers must install, at their own cost, specified low cost measures to reduce operating and energy costs (HVAC temperature reset, outside air reduction, optimize HVAC start-up, lighting, add VFD’s, etc.)